Erosion Control Services in Dallas–Fort Worth
Terradyne installs and maintains the full range of erosion and sediment control across the Dallas–Fort Worth metroplex — the site perimeter, the ditches, the slopes, the exits, and everything else a plan sheet calls for.

What is erosion control, and who needs it?
Erosion control keeps disturbed soil from washing off a construction site and into the street, the storm drain, or the creek downstream — a mix of practices that hold soil in place or catch it before it leaves. TXR150000 defines small construction activity to include clearing, grading, and excavating that disturb at least one acre and less than five acres. On nearly every dirt-moving job of that size in North Texas, a set of controls goes in before work starts and stays until the ground is stable again.
Every erosion control service, at a glance
32 servicesNo reading required — the full erosion control lineup, grouped the way the work groups.
Perimeter & Sediment Control
- Silt Fence Installationsediment fence, silt fencing, wire-back silt fence
- Branded Silt Fence (Logo-Printed)custom printed silt fence, branded fabric, logo silt fence
- TxDOT Heavy-Duty Silt Fenceheavy duty silt fence, reinforced silt fence, Item 506 silt fence
- Sediment Logs & Wattleswattle, fiber roll, silt sock
- Rock Filter Damsrock check dam, check dam, ditch check
- Storm Drain Inlet Protectiondrain protection, storm drain protection, inlet filter
Site Access & Construction Exits
- Stabilized Construction Entranceconstruction exit, stabilized construction access, rock entrance pad
- Entrance Redress & Re-Rockingredress entrance, re-rock entrance, top-dress aggregate
Slope, Channel & Hard Armor
- Armormax InstallationPropex Armormax, engineered earth armor, HPTRM+ECRM system
- Flexamatflexible concrete mat, tied concrete block mat, articulated block
- Gabion Baskets & Mattressesgabion basket, gabion mattress, gabion wall
- Ripraprip rap, rip-rap, rock armor
Stabilization & Revegetation
- Coir / Coconut Erosion Matcoir mat, coconut fiber blanket, C-350
- Hydromulchinghydraulic mulch, hydro mulch, hydroseeding (comparison only — NOT a Terradyne service)
- Seedingdrill seeding, native seeding, seed
- Sod Installationsodding, turf install
- Erosion Control BlanketsCurlex, RECP, straw blanket
- Turf Reinforcement Mats (TRM)TRM, turf reinforcement matting, HPTRM
Dewatering Services
Discharge Controls
Tree & Site Protection
- Tree Protection Fencingtree fencing, dripline protection fence, drip line fence
- Safety & Chain-Link Fencingsafety fence, orange safety fence, vinyl safety fence
- Trunk Protection (Board Protection)board protection, trunk boarding, tree trunk armor
Erosion Control Materials
The families of erosion control

Which controls a site needs depends on its soils, slopes, and drainage — the right mix is a plan decision, not a catalog order.
Frequently Asked Questions
Which erosion controls does my site need?
It depends on the site — its slopes, its soils, where the water goes, and what the plan sheet and the city require. Most jobs use a perimeter of sediment control plus a stabilized exit at minimum, then add slope and channel protection where the terrain demands it.
Do I install everything at once?
No. Controls go in by phase: perimeter and access controls first, before the ground opens up; slope and channel protection as grading exposes those areas; stabilization as the work finishes. Sequencing is part of the plan.
One contractor, the whole program

Erosion control is one of Terradyne's service divisions, alongside SWPPP Services for the plan and the permit and site maintenance for the upkeep. The advantage of one contractor across all three is that the controls on the plan are the controls in the ground, and the crew that installs them is the crew that comes back to maintain them — nothing falls through the gap between trades.
Request a bid
Send your plans to bids@terradynegroup.com or call (214) 878-7392 for erosion and sediment control across Dallas–Fort Worth. Tell us the site and the scope, and we will match the controls to the plan.
1
2
3
4
5
6
7
8
9