Gunter, TX SWPPP & Stormwater Requirements

Updated August 2026
Gunter sits in the growth corridor north of the Metroplex without a city stormwater program of its own, which puts the state construction permit at the centre of every job here.
What does Gunter require for SWPPP compliance?
A search of TCEQ's MS4 Phase II authorization registry for Grayson County on August 9, 2026, covering all authorization statuses, returned five records — the cities of Sherman, Denison and Pottsboro and a state transportation district — and none for Gunter.
An incorporated city, without a city stormwater program
The U.S. Census Bureau's 2024 Texas place gazetteer lists Gunter as an incorporated city with an active local government.
No city stormwater program does not mean no obligations — it means the state permit is the rulebook your crews answer to, and nobody local is checking it for you. Plats, drainage design and floodplain permitting still run through local review; what is absent is a municipal construction-stormwater program layered on top of the state's.
The state permit is the whole rulebook here
A stormwater pollution prevention plan (SWP3) must be prepared and implemented before construction activities begin. TXR150000's standard schedule requires construction site inspections at least once every 14 calendar days and within 24 hours of the end of a storm event of 0.5 inches or greater.
With no city inspector auditing the file, the operator's own record is the only evidence the program was run — which makes the inspection discipline more important here, not less.
Inspections and the record
The operator owns the inspection record from first disturbance to final stabilization. Terradyne provides routine SWPPP inspection reports with cloud-based client access. See SWPPP Inspections for how the program works, and Silt Fence Installation for the perimeter that gets looked at first.
Check before you mobilize
Ordinances and city standards get revised; confirm the current documents with the city before you mobilize. A city can seek authorization as it grows, so re-check the registry before a long project rather than assuming today's answer holds. For other North Texas cities, start at Local Compliance.
Frequently Asked Questions
Does Gunter have its own stormwater program?
No — the section above gives the registry finding and the date it was checked. What governs your site is the state program, and the operator carries it.
So what governs a construction site in Gunter?
The state construction general permit — the plan before the dirt, the inspection schedule after it, and the record all the way to final stabilization.
Could that change?
A city can seek authorization as it grows, so re-check the registry before pricing a long project rather than assuming today's answer still holds.
Request a bid
Send your Gunter project's plans to bids@terradynegroup.com or call (214) 878-7392 for SWPPP and erosion control support. Tell us the acreage and the schedule, and we will bring the plan, the controls, and the inspection cadence the permit expects.